Oldest pages
From CSU-CHILL
Showing below up to 100 results in range #51 to #150.
- Research (13:34, 29 March 2008)
- Wireless Link (19:34, 29 March 2008)
- Radome Status (09:26, 8 April 2008)
- Casebook 7 September 2006 (01:51, 10 April 2008)
- Interpreting Housekeeping data (TN-002) (13:49, 29 April 2008)
- Coherent Leakage (TN-003) (13:49, 29 April 2008)
- High Rain Rates at Denver International Airport Observed with Indexed Beams (15:15, 29 April 2008)
- Image loop demo (17:14, 29 April 2008)
- Power Supply selection for RF Components (TN-005) (00:24, 5 May 2008)
- Bright band polarimetric signatures (09:45, 23 June 2008)
- Live video feed (13:08, 22 July 2008)
- Extreme Rain Rates Observed on June 19th 2002 (23:06, 27 July 2008)
- First Look Data Collected with the Dual Offset feed Antenna (23:09, 27 July 2008)
- Hydrometeor classification in an RHI sweep taken with the dual offset feed antenna (15:24, 29 July 2008)
- VCHILL Downtime (12:15, 1 August 2008)
- Frequency Synthesizer User's Guide (TN-006) (13:13, 17 August 2008)
- Examples of Polarimetric Weather Radar Applications and Limitations (14:28, 25 August 2008)
- Differential attenuation Zdr artifacts (14:29, 25 August 2008)
- Hydrometeor classification example (14:30, 25 August 2008)
- Radar Tutorials (14:31, 25 August 2008)
- Differential Reflectivity from Raindrops and WSR-88D Rainfall Estimation (06:47, 26 August 2008)
- Scientific Director's Overview of 2007 (15:58, 11 September 2008)
- Hailstorm observation of 20 June 2008 (10:53, 30 September 2008)
- CSU-CHILL Open House: Oct 3, 2008 (15:28, 15 October 2008)
- Educational Outreach (17:25, 16 October 2008)
- Installation of the Dual Offset Feed Antenna (21:21, 16 October 2008)
- Initial N-Pol Operations at the CHILL (17:16, 6 November 2008)
- Transformation of CHILL to the VCHILL Era (10:25, 21 November 2008)
- Polarimetric fields in a developing cumulonimbus (CB) cloud on 10 August 2008 (12:23, 26 November 2008)
- Radar Operations Summary (2006-2007) (01:20, 2 December 2008)
- CHILL Newsletter 2007 (01:20, 2 December 2008)
- Clock Generator User's Guide (TN-007) (20:21, 4 December 2008)
- Dual polarization hail signatures observed on 14 August 2008 (14:45, 23 January 2009)
- Dual polarization fields in the 14 August 2008 hailstorm (01:19, 1 February 2009)
- Casebook 26 May 2003 (14:19, 19 February 2009)
- Selected images from the 29 March 2009 blizzard (16:19, 26 March 2009)
- Selected images from the 26 March 2009 blizzard (15:51, 31 March 2009)
- Melting hail signatures on 8 July 2008 (09:56, 23 April 2009)
- Books or Other One-time Publications (18:47, 28 April 2009)
- Journal Publications (01:57, 29 April 2009)
- ASP lab response case: 23 June 2008 (17:33, 3 June 2009)
- ASP lab evolution and response case 7 July 2008 (17:33, 3 June 2009)
- ASP lab textbook examples: 2 July 2008 (18:21, 3 June 2009)
- Initial Performance Evaluation of the Dual Offset Feed Antenna (15:32, 10 June 2009)
- High rain rates at Denver International Airport on 23 June 2009 (19:24, 27 July 2009)
- An example of reflectivity-based rain rate over-estimation due to ice hydrometeor contamination (16:34, 27 August 2009)
- Pedestal/Encoder Interface Board User's Guide (18:14, 30 August 2009)
- Macroburst radial velocity pattern on 23 July 2009 (23:48, 1 September 2009)
- Boundary layer roll echoes observed on 22 July 2008 (23:52, 1 September 2009)
- An example of reflectivity-based rain rate over-estimation due to ice hydrometeor contamination on 18 August 2009 (00:03, 2 September 2009)
- Casebook (00:09, 2 September 2009)
- CSU-CHILL Receiver Front End (16:54, 21 September 2009)
- High time resolution RHI scans through a developing thunderstorm: 30 May 2009 (12:00, 11 October 2009)
- Development of hail and heavy rain signatures in a thunderstorm: 29 June 2007 (10:44, 2 November 2009)
- Casebook 19 June 2003 (11:17, 6 November 2009)
- Student Publications (22:45, 18 November 2009)
- Digital Waveform Synthesizer User's Guide (12:27, 14 December 2009)
- Time lapse photography of a cumulonimbus cloud: 2 July 2009 (12:57, 30 December 2009)
- Time variations in bright band height: 12 September 2009 (17:02, 18 February 2010)
- Brightband observations: 12 September 2009 (10:09, 4 March 2010)
- Radar: Tomorrow's Raingauge (10:47, 2 April 2010)
- UNTITLED (13:38, 14 April 2010)
- Tornado Observation from May 22, 2008 (22:28, 20 April 2010)
- Convective storm initiation: 9 August 2008 (16:24, 2 May 2010)
- Radial velocity indication of shifting wind direction: 27 July 2009 (12:02, 24 May 2010)
- Outflow development beneath a thunderstorm complex: 8 July 2008 (06:53, 1 July 2010)
- CHILL Signal Processor (13:38, 9 August 2010)
- Severe thunderstorm outflow: 26 June 2009 (14:37, 31 August 2010)
- Local flooding in Byers, Colorado: 7 July 2010 (11:36, 12 November 2010)
- X-band Solid State Transmitter Monitor User's Guide (TN-008) (11:29, 1 January 2011)
- Casebook 23 April 2005 (12:25, 1 January 2011)
- Antenna Pattern Evaluation (12:26, 1 January 2011)
- Radar calibration sphere flight: 2 December 2010 (12:59, 1 January 2011)
- Example Multiple-Doppler Radar Analysis from the Colorado Front Range area: 31 Dec 2010 (10:42, 1 February 2011)
- Outflow surge from an area of thunderstorms: 8 July 2010 (07:42, 9 March 2011)
- Aircraft targets as seen by the CSU-CHILL radar: 16 March 2011 (15:37, 22 March 2011)
- Gust front collision: 2 July 2010 (15:40, 22 March 2011)
- Evolution of a three body scattering signature: 26 May 2010 (15:41, 22 March 2011)
- An RHI scan through a severe thunderstorm: 21 June 2010 (13:49, 29 April 2011)
- Evolution of radial velocity and rain rate fields in low elevation PPI sweeps of a thunderstorm: 30 July 2010 (23:54, 10 June 2011)
- Polarimetric radar identification of frozen hydrometeors in thunderstorm precipitation: 6 August 2010 (15:38, 27 June 2011)
- Dumbbell Shaped ZDR Patterns: 19 August 2002 (21:18, 22 July 2011)
- Polarimetric Rainfall case at DIA: 19 June 2003 (21:38, 22 July 2011)
- HDR hail map from 9 June 2004 (21:40, 22 July 2011)
- Casebook 21 June 2001 (22:16, 22 July 2011)
- Time Lapse Test (14:13, 4 August 2011)
- 11aug2011 Time Lapse Test (15:31, 12 August 2011)
- 22aug2011 Time Lapse Test (14:02, 22 August 2011)
- 23aug2011 Sun Track Test (12:36, 23 August 2011)
- Time lapse observations of outflow phenomena: 11 August 2011 (23:42, 8 September 2011)
- Fine line passage at Denver International Airport: 30 August 2011 (10:08, 1 October 2011)
- Differential attenuation patterns: 19 August 2011 (21:28, 1 November 2011)
- Rain to snow transition (17:17, 1 December 2011)
- RHI scans through thunderstorm and snow echoes (17:24, 1 December 2011)
- Damaging hailstorm at Denver International Airport: 13 July 2011 (02:15, 3 January 2012)
- Differential echo motions: 24 June 2005 (02:25, 3 January 2012)
- Initial CSU-CHILL X-band operations: January 2012 (15:47, 2 February 2012)
- 14jul2011 hail case overview 1 (13:07, 8 February 2012)
- 2mar2012 snow zdr evolution (17:26, 7 March 2012)
- 29mar2012 smoke (14:40, 30 March 2012)