File:CH 16 flip.gif: Difference between revisions

From CSU-CHILL

No edit summary
 
(Added image caption)
 
Line 1: Line 1:
 
Bob Bowie conducts initial high-power testing of the new V channel transmitter on 20 January 1995. At this point, the waveguide runs to the antenna had not been completed; transmitter power was absorbed by a dummy load. Meteorological data collection with the dual transmitter configuration started in April 1995.

Latest revision as of 13:25, 26 August 2020

Bob Bowie conducts initial high-power testing of the new V channel transmitter on 20 January 1995. At this point, the waveguide runs to the antenna had not been completed; transmitter power was absorbed by a dummy load. Meteorological data collection with the dual transmitter configuration started in April 1995.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current11:18, 10 August 2020Thumbnail for version as of 11:18, 10 August 2020750 × 1,111 (505 KB)Pat kennedy (talk | contribs)

The following page uses this file: