CHILL Newsletter 2007: Difference between revisions

From CSU-CHILL

No edit summary
(Updated page style, added to categories)
Line 1: Line 1:
*[[Scientific Director's Overview]]
This is the CHILL newsletter for 2007.
*[[Installation of the Dual Offset Feed Antenna]]
 
*[[Initial Performance Evaluation of the Dual Offset Feed Antenna]]
{|
*[[Radar Operations Summary]]
|-
| valign=top | [[Image:picture_of_steve.jpg|150px]]
| valign=top |
;[[Scientific Director's Overview]]
:Brief summary here...
|-
| valign=top | [[Image:CHILL 2004 Antenna.jpg|100px]]
| valign=top |
;[[Installation of the Dual Offset Feed Antenna]]
:This article talks about installing the Dual Offset Feed Antenna system at CSU-CHILL.
|-
| valign=top | [[Image:Bringi newsletter fig8.png|150px]]
| valign=top |
;[[Initial Performance Evaluation of the Dual Offset Feed Antenna]]
:This article illustrates the high quality of dual-polarized data available from the CSU-CHILL radar system after installation of the new 8.5 m Dual-offset antenna. Measurements of stratiform rainfall are used to highlight the characteristics of the antenna and radar.
|-
| valign=top | [[Image:Nlet band 600.png|150px]]
| valign=top |
;[[Radar Operations Summary]]
:The in house designed digital receiver / signal processing systems used in the CSU-CHILL and Pawnee radars continued to be tested and refined during 2007. (They were initially fielded on both radars during the summer of 2006). CSU-CHILL operations were suspended in July 2007 to prepare the Greeley radar site for the installation of the new dual offset feed antenna.
|-
|}
 
[[Category:Newsletter]]
[[Category:Newsletter 2007|2007]]

Revision as of 16:31, 21 August 2008

This is the CHILL newsletter for 2007.

File:Picture of steve.jpg
Scientific Director's Overview
Brief summary here...
Installation of the Dual Offset Feed Antenna
This article talks about installing the Dual Offset Feed Antenna system at CSU-CHILL.
Initial Performance Evaluation of the Dual Offset Feed Antenna
This article illustrates the high quality of dual-polarized data available from the CSU-CHILL radar system after installation of the new 8.5 m Dual-offset antenna. Measurements of stratiform rainfall are used to highlight the characteristics of the antenna and radar.
Radar Operations Summary
The in house designed digital receiver / signal processing systems used in the CSU-CHILL and Pawnee radars continued to be tested and refined during 2007. (They were initially fielded on both radars during the summer of 2006). CSU-CHILL operations were suspended in July 2007 to prepare the Greeley radar site for the installation of the new dual offset feed antenna.